CH-640 Fuselage Front Z and torque tube tunnel (1 of 70)




Draw center line of front of 20-F-10-1 (Forward Z)  Measure 60 mm left and right and draw two lines.  This will be the location of the two side walls.
Draw center line of front of 20-F-10-1 (Forward Z) Measure 60 mm left and right and draw two lines. This will be the location of the two side walls.