CH-640 Fuselage Front Z and torque tube tunnel (22 of 70)




The IPL never tells you to do this step, but the drawings show the diaphrams riveted to the side walls.  Line up the diaphrams square to the front and mark their position on the side walls.
The IPL never tells you to do this step, but the drawings show the diaphrams riveted to the side walls. Line up the diaphrams square to the front and mark their position on the side walls.