CH-640 Fuselage Front Z and torque tube tunnel (35 of 70)




Position 20-F-10-3 (front upright) 90 deg. to the top of the front Z and flush to the ends of the Z.
Position 20-F-10-3 (front upright) 90 deg. to the top of the front Z and flush to the ends of the Z.