CH-640 Fuselage Hull - Stage One (9 of 206)




Measure 16 mm from the rear of the last floor Z and draw a line.  Position the front of 640-F-28-4 (battery support) on this line.  This image also shows F-28-1 (battery backer plate) in place against the HT frame.  I have not installed this yet and just had it in place to double check measurements against the drawing.  Which by the way did not work out so I need to call Zenair to figure out why but I don't think this is really a big deal.
Measure 16 mm from the rear of the last floor Z and draw a line. Position the front of 640-F-28-4 (battery support) on this line. This image also shows F-28-1 (battery backer plate) in place against the HT frame. I have not installed this yet and just had it in place to double check measurements against the drawing. Which by the way did not work out so I need to call Zenair to figure out why but I don't think this is really a big deal.