CH-640 Fuselage Hull - Stage One (106 of 206)




Slide 20-F-7-5 between 20-F-7-6 and  20-F-7-3.  Now rivet the sides.  Again, be sure to use SS rivets.
Slide 20-F-7-5 between 20-F-7-6 and 20-F-7-3. Now rivet the sides. Again, be sure to use SS rivets.