CH-640 Fuselage Front Z and torque tube tunnel (51 of 70)




Position 20-F-8/5 (floor support) to the front of the front Z.  The top of the floor support is to be lined up with the 73mm line.
Position 20-F-8/5 (floor support) to the front of the front Z. The top of the floor support is to be lined up with the 73mm line.