CH-640 Fuselage Hull - Stage One (135 of 206)




This should have been done when I assembled the Front Z and torque tube tunnel sub-assembly.  However I did not have this part at that time so I'm doing it now.  Install 20-C-10-2 (fairlead) to the front part of the front Z, parallel and centered, down 70mm from the top of the Z.