CH-640 Fuselage Hull - Stage One (175 of 206)




For this step I needed a helper so Rob gave me a hand by putting in the clecoes as I drilled the bulkheads from inside the fuselage.  From inside the fuselage I measured each bulkhead to position them to the top longerons and also checked to make sure each bulkhead was at 9 degrees.
For this step I needed a helper so Rob gave me a hand by putting in the clecoes as I drilled the bulkheads from inside the fuselage. From inside the fuselage I measured each bulkhead to position them to the top longerons and also checked to make sure each bulkhead was at 9 degrees.